Eldrin Single Bed Blueprint (L)

Construction

Ingredient Amount TT Markup (%) Total
Cumbriz Ingot 2 0.45 PED 0.90 PED
Long Stinktree Board 2 0.52 PED 1.04 PED
Small Plugs 13 0.14 PED 1.82 PED
Sum: 3.76 PED

Product: Eldrin Single Bed (C)

Acquisition


No data available.