Matalin Single Bed Blueprint (L)

Construction

Ingredient Amount TT Markup (%) Total
Cumbriz Ingot 1 0.45 PED 0.45 PED
Large Plug 6 0.11 PED 0.66 PED
Short Midastree Board 4 0.04 PED 0.16 PED
Small Plugs 10 0.14 PED 1.40 PED
Sum: 2.67 PED

Product: Matalin Single Bed (C)

Acquisition


No data available.