Pitbull Mk. 2 (C,L) Blueprint (L)

Construction

Ingredient Amount TT Markup (%) Total
Caldorite Ingot 1 0.51 PED 0.51 PED
Chair Frame 3 0.40 PED 1.20 PED
Drive Shaft 6 0.90 PED 5.40 PED
Light Liquid 2 0.84 PED 1.68 PED
Rubber Lists 2 0.40 PED 0.80 PED
Sum: 9.59 PED

Product: Pitbull Mk. 2 (C,L)

Acquisition


No data available.