Shear Pro700 (L) Blueprint (L)

Construction

Ingredient Amount TT Markup (%) Total
Animal Spleen Oil 2 5.00 PED 10.00 PED
Kanerium Ingot 2 7.50 PED 15.00 PED
Putty 3 0.78 PED 2.34 PED
Robot Tilt Compensator 1 10.50 PED 10.50 PED
Triphased Wires 23 0.12 PED 2.76 PED
Sum: 40.60 PED

Product: Shear Pro700 (L)

Acquisition


No data available.