Vivo UR200 (L) Blueprint (L)

Construction

Ingredient Amount TT Markup (%) Total
Himi Ingot 3 0.426 PED 1.278 PED
Ignisium Ingot 2 2.10 PED 4.20 PED
Robot Casing 4 1.01 PED 4.04 PED
Simple 2 Plastic Springs 11 0.75 PED 8.25 PED
Sum: 17.768 PED

Product: Vivo UR200 (L)

Acquisition


No data available.