Ziplex A33 (L) Blueprint (L)

Construction

Ingredient Amount TT Markup (%) Total
Accelerative Matrix Component 3 2 0.50 PED 1.00 PED
Basic Nuts 48 0.01 PED 0.48 PED
Hardened Nuts 4 0.033 PED 0.132 PED
Ignisium Ingot 2 2.10 PED 4.20 PED
Iron Ingot 3 0.39 PED 1.17 PED
Lystionite Steel Ingot 1 4.0146 PED 4.0146 PED
Narcanisum Ingot 2 0.24 PED 0.48 PED
Robot Thermal Sensor 4 0.35 PED 1.40 PED
Simple 3 Conductors 3 1.10 PED 3.30 PED
Zinc Ingot 4 0.30 PED 1.20 PED
Sum: 17.3766 PED

Product: Ziplex A33 (L)

Acquisition


No data available.

Ziplex A33 (L) Blueprint (L)

General

Weight 0.1kg
Level 9
Type Tool
Book Limited (Vol. 1) (C)
Product Amount 1 - N/A

Economy

Cost 17.38 PED
Boosted No

Skill

SiB Yes
Profession Tool Engineer
20 - N/A

Misc

PED/h 12511.15 PED